Short answer
Both orders are used. Wrap-first is the usual default, with the house wrap going on before the windows are set. Windows-first is also accepted, and it is often chosen for windy weather, open framing or a tight schedule. In either order, the sill pan goes in before the window, and each layer of water protection should overlap the layer below it so water runs outward.
Why wrap first is the usual default
When the wrap goes on first, it covers the whole wall without breaks, and openings are cut through it afterward. The wrap can then be shingled in the normal way, with each course lapping over the one below. That keeps the flashing detail simpler, and it is the order most crews expect.
When windows go in first
Windows-first is chosen when conditions or the schedule call for it:
- Windy weather. A loose wrap can flap and tear in strong wind, so some crews set the windows first to avoid that.
- Open framing. Where there is no sheathing behind the wrap, the wrap can tear or sag while it is handled.
- Inspections and scheduling. In some areas, the wrap has to wait for an inspection of the sheathing. The windows may then go in first to keep the job moving.
Some builders also prefer windows first because they want the openings closed up quickly.
What matters in either order
- The sill pan goes first. A sill pan is a flashing that sits under the window and carries water outward. It should be in place before the window goes in, whichever order the crew uses.
- Layers overlap like shingles. At the sill, each layer lies over the one below it, so water runs down and out. The same logic applies at the sides and the top of the opening.
- The window maker’s instructions come first. Manufacturers set out how their flanges and seals should be integrated with the wrap. Follow those details.
The downside of wrap after windows
If the wrap goes on after the windows are in, it has to be taped to the window frame, which takes more labor. Building-science sources argue that wrap installed after the windows cannot be shingled properly, so the layers may not shed water as well. Taping can work when it is done carefully with the right flashing tape, but it leaves more joints to check.
Other things to plan around
The window also needs the right gap around the frame in the rough opening, so the shims and sealant have room to work. For the spacing, see how much gap do you leave when framing a window.
If plaster is part of the same job, the order of the wrap, the windows and the plaster needs to be planned together. New windows or plaster first covers that question. On a stucco wall, the choice is more involved, and should you remediate stucco or replace windows first explains the trade-offs.
Bottom line
Windows can go in before or after house wrap. Wrap-first is the usual default and gives simpler shingling. Windows-first suits windy weather, open framing or tight schedules. Either way, the sill pan goes in first and each layer must overlap the one below it. The window maker’s instructions and local inspection rules should decide the details for your house.